The situation
![]() Many low volume parts ![]() More over, for each part, there could be local deformation or errors on sub-assemblies: ![]() Solution
![]() ![]() 1. Load Part 2. Set Parameters
3. Part scanning Based on parametric information entered, with NO programmation, the robot knows where to scan. 4. Part analysis In real-time, the part is analysed based on its 3D features. Automatically, key features and datums are found. Part inspection can also occur at the same time.
5. Path generation The robot path is updated. The path generation will make sure there will be no potential collisions.
6. Robotized welding Based on the path determined automatically by the system, the robot starts to weld the two parts together. Click here to go to case study 2: Cutting Metal Part